Smurf Efficient Super Elastic Waterproof Coating

After-sales Service: on-Line Technical Support
Main Features: (Implementation Standard: GB/T19250-2013)
Method: Brush Coating, Roller Coating, Spraying Can Be
Type: Waterproof Paint
Scope of Application: Engineering, Subway, Tunnel, Bridge, Reservoir
Chinese Name: Polyurethane Multifunctional Waterproof Coating
Samples:
US$ 1/kg 1 kg(Min.Order)
| Request Sample
Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Shape
Liquid
Model No.
1
Materials
2
Performance
3
The Adjuster
4
Color
5
Warranty
6
Solid Content
7
Heat Resistance
8

Product Description

Smurf high-efficiency super-elastic waterproof coating is a two-component waterproof coating composed of organic liquid and inorganic powder. It is a new type of waterproof coating that has the advantages of high elasticity of organic materials and good durability of inorganic materials.
Features:
1. Can be constructed on wet or dry base layers of various materials;
2. The coating is tough and high-strength, has good water resistance, good weather resistance and excellent durability;
3. Pigments can be added to form a colored coating;
4. Non-toxic, odorless and pollution-free, safe, simple and short construction period;
5. The construction on the inside, coating surface and top surface will not flow;
6. Can be firmly bonded to various outer materials such as base surface and cement mortar;
7. High temperature resistance up to 140ºC.
  use:
It can be used for waterproofing projects of various new and old architectural structures (for example: house roofs, underground exterior walls, toilets and bathrooms, tunnels, bridges, pools, etc.)
Instructions
1. The base surface must be flat, firm, clean, free of open water and leakage. The uneven areas must be plugged first, and the yin and yang corners should be made into arc corners.
2. Take the materials according to the specified proportion. If you need to add water, add it to the liquid material first, and add it while stirring with a stirrer. Stir thoroughly until there are no lumps in the ingredients (mixing time is more than 3 minutes, it is best not to stir by hand).
3 Construction ratio: First coating ratio: liquid material 1: powder material 1: water 1, stir evenly and apply. Second coating: Liquid 1: Powder 1, stir evenly and apply. The third coat is the same as the second coat. The interval between each application shall be subject to the fact that the coating does not stick to your hands.
4. The construction of the protective layer or decorative layer must be carried out 2 days after the waterproof layer is completed. When applying mortar, in order to facilitate construction, clean medium-coarse sand can be sprinkled immediately after the last coat of waterproof layer. Liquid material: Powder material = 10:20-30, mix it into a putty shape, and can also be used as a bonding and sealing material.
Precautions
1. If the paint (especially the primer) has sedimentation, stir it evenly at any time.
2. The coating should be as uniform as possible without local deposition. It is also required to roll and brush several times to ensure that there are no air bubbles between the coating and the base layer, and the bonding is tight.
3. Each layer of coating must be taken according to the prescribed amount. It cannot be too thick or too thin. If the thickness of the final waterproof layer is not enough, one or more layers can be added. The total number of coatings should be no less than 3 layers.
4. The time interval between each layer shall be based on the time when the previous layer of coating is dry and non-sticky (generally it takes 3-6 hours, if the site temperature is low, the humidity is high, the ventilation is poor, the drying time will be longer, otherwise it will be shorter).
5. It cannot be constructed below 0ºC or in the rain. It is not suitable to be constructed in a particularly humid and non-ventilated environment, as it will affect the film formation.
Storage and transportation
1. Protect from the sun and rain, and keep the packaging intact.
2. Liquid materials need to be stored in a cool place above 5ºC, and powder materials need to be stored in a dry place. The shelf life is 6 months.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2024

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Management System Certification
ISO 9001, ISO 9000